1.
Montazeri FZ, Daneshmand-Mehr M. A Robust Iterated Greedy Algorithm for Distributed Flow Shop Scheduling with Uncertain Inter-Factory Transportation Times. Syst. Anal. Published online September 21, 2026:193-207. doi:10.31181/sa202586